SR. NO. | NAME & PLACE | TYPE OF JOB | VALUE RS. |
---|---|---|---|
INDUSTRIES : | |||
1 | MSETCL |
Establishment Of 132/33KV S/S At Yavatmal MIDC In Yavatmal Dist Design, Supply, Civil work & Erection Testing Commissioning of the required material 1) Installation Of 2x25 MVA, 132/33KV Transformer With Associated Bays (2x25MVA 132/33KV Transformer Will Be Supplied By MSETCL Erection In Bidder Scope 2) 132KV Line Bay - 2nos 3) 132KV Line Bay - 2no (At 132KV Yavatmal S/S) 4) 33KV Out Lets - 8nos |
Rs. 8,75,06,959.00 Eight Crore Seventy Five Lacks Approx |
2 | MSETCL |
Establishment Of 132/33KV S/S At Samsherpur In Dist Nandurbar Under Nashik Zone Design, Supply, Civil work & Erection Testing Commissioning of the required material 1) Installation Of 1x25 MVA, 132/33KV Transformer (1-Bus) With Bays (Transformer Will Be Supplied By MSETCL Erection In Bidder Scope 2) 132KV Line Bay - 2nos 3) 33KV Out Lets - 4nos |
Rs. 4,45,28,582.00 Four Crore Fourty Five Lacks Approx |
3 | MSEDCL |
Turnkey Contract for Balance left out works under infrastructure plan part-I, Phase -II Scheme, Tender No. T-1 Poject Covering works for Supply of Material, for new 33/11KV, 1X5MVA Shirgaon Substation and other allied works including guarantee/defect liability period in Chiplun Division under Ratnagiri Circle of Konkan Zone. Supply, erection, testing & commissioning of 33/11kV, 1x5MVA New Substation out door type No. 1 Supply, erection, testing and commissioning of 33KV feeder bay with gantry structure no. 1 Supply, erection, testing & commissioning of 33KV line single ckt pin type with 100sq. mm. ACSR conductor on RSJ pole 152X152 mm – 11MTR with crimping of jumpers at cut point location – 8KMS Supply, erection, testing & commissioning of 11KV line Pin type with 55 sq.mm. AAAD 200Kg PSC pole – 9Mtr long – 2KMS |
Rs.1,80,69,551.00 One Crore Eighty Lacks Approx |
4 | Central Railway |
Central Railway, Office of Divisional Electrical Engineer (Construction) Pune Modification to HT 3 Nos. 33 KV – 17 Nos, 11 KV AND LT Crossing – 33 Nos. in Asti – Amalner section in connection with Ahmednagar – Beed New Railway Line. |
Rs.97,00,000.00 Ninty Seven Lacks |
5 | Nashik Urban Project |
M/s. Cobra Instalaciones Y Servicios, Nashik Urban – I & II Infra Project
Total Electrical Infrastructure development of Nashik city. 1. 33 KV/11KV Substations - 13 Nos. 2.Augumentation of 33KV/11KV S/S - 10 Nos 3.33 KV O/H Lines - 80 Kmtrs 4.11KV O/H Lines 175 Kmtrs 5.33KV Cable laying 22 Kmtrs 6.11 kv cable laying 110 Kmtrs 7.DP Transformers 1870 Nos. |
Rs.20,40,92,625.00 Twenty Crore Fourty Lacks Approx |
6 |
Divisional Electricals Engineer (Construction) Central Railway Pune) |
33kv ,11kv, and 415 volts substations, overlead,under cables and allied works at Ahamadnagar place of work |
75,00000.00 Seventy Five Lacs. |
7 |
Dy Chief Electrical Engineers (Construction) Western Railway, Mumbai |
132kv/27kv traction substation |
510,00000.00 Five hundread and ten Lacs. |
8 |
Chief Engineerings Infra Nashik |
33kv / 11kv substation and allied works at Nashik |
2060.00 Two thousand and Sixty Lacs. |
9 |
Praxair Industries Pvt Ltd. Murbad |
110kv substation works at Mumbai | 35800000 |
10 |
Tata Motors Ltd
Pimpri Pune Chinchwad ( On Annual Rate Contract Basis for Over 12 Years ) Telco Guest House, PCMC |
1.] 22kv/11kv – 20MVA – 3No 22KV-2MVA TRANSFORMER Substation including breaker (
VCB,ACB ) HT Panel
40 Nos. |
40000000.00 Four Crores |
2.] Do as above 22KV –5MVA
15 Nos. |
20000000.00
Two Crores |
||
3.] 20Kms,22KV cable laying underground Raychem cable jointing/terminations.
15 Nos. |
6000000.00 Sixty Lakhs |
||
4.] 22KV Erection and Commissioning only of CTPT | |||
5.] Conduit wiring and Erection, installation of Industrial Highway/Lowbay Lighting
with special Fixtures.
2200 Nos. |
2200000.00 Twenty-Two Lakhs |
||
6.] Erection and installation of overhead busbar system in huge machine shops areas |
700000.00 Seven Lakhs |
||
7.] Cubicle Panels Erection
60 Nos. |
160000.00 One Lakh Sixty Thousands |
||
8.] Internal wiring through office Desks / Furniture | |||
9.]Relay Testing / Panel Testing |
1200000.00 Twelve Lakhs |
||
11 |
Tata Motors Ltd. Sanand [ NANO PLANT] |
Electrical work related to power distribution And lighting work. |
72033250.00 Seven Crores Twenty Lakhs Thirty-Three Thousands Two Hundred and Fifty |
12 |
Fiat India Automobile Pvt Ltd., Ranjangaon |
Carried out LT Power distribution work consist of LT panels, LT Cables, Distribution Boards and Lighting fixtures. |
29000000.00 |
13 |
Mercedes Benz India Ltd. Pimpri and Kuruli ( Near Chakan ) Dist. Pune. |
1.]22KV –2MVA HT substation with breaker panels, Erection , Testing and Commissioning
4 Nos. |
2000000.00 |
2.] LT Cabling, Panel Erection Job |
1000000.00 |
||
3.] 5Kms. HT Cable laying underground Raychem cable jointing / terminations. | |||
4.] Internal wiring through office Desks / Furniture. | |||
5.] Relay Testing / Panel Testing | |||
14 |
L & T John Deere Ltd., Sanaswadi,Pune – Nagar Road, Dist. Pune. Mercedes Benz India Ltd. Pimpri and Kuruli ( Near Chakan ) Dist. Pune. |
1.]Supply, Erection and Testing & Commissioning with MSEB & Govt. approval. 22KV
ACSR 0.2 size conductor Double circuit OH Line Including erection of ISMB Poles
& Super Structure.
7 K. M. |
26000000.00 |